Variations and Site Request Form

What's the Project Address?

Readable Variation Number!


Choose ONE - the type of service required

Who is paying for the variation? External - Customer is paying; Internal - FSS is paying

Select the quote type

Select the Work type

Manual Handling Required for this variation?

How Long Vertical & How Long Horizontal for this variation?

Scaffolding Works Location for this variation?

Measurement and Configuration of Variation Scaffolding.

Scaffolding Works between walls?

Is Material available onsite?


Description Details
     Create opening for forklift on ground floor by removing legs via suspension  







@Yousif Yousif from Ranji: The client has requested two more changes to the scaffold/B-Class Hoarding as follows; (a) The inside legs of the two bays of B Class Hoarding (3 legs) between gridlines C5-C6 to be discontinued and transferred to new scaffold legs inside the site boundary with a gap of 600mm (b) New Forklift access opening along gridline BA/C2 Our fee for the Engineering assessment and modification sketches for above two items would be $700- plus gst.
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2025-09-10 09:38:16AM by Reabie Pana
Task Created!
Task Created By Reabie Pana
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2025-09-10 09:38:21AM by Reabie Pana
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2025-09-12 10:52:03AM by Yousif Yousif

Upload pictures of your request

Drag & drop files here, or browse

Preview

Who is submitting the form?